The 155 m3 were supplied and fitted in 2 construction phases. A 24.7 m long truck was responsible for transporting the materials. The narrow arches with a radius of 4 m posed complications. It was only possible to load them onto a truck using a suspension bridge.
Project information | |
---|---|
Location: | Liptovský Mikuláš, Slowakei – Hohe Tatra |
Customer: | Kontrakting s.r.o |
Year of construction: | 2012–2013 |
Span length of building: | 60 x 64 m |
Maximum span lengths: | Longest beam 24.7 m |
Type of construction: | Curved beams, covered with film |