This project is the first closed hall for horse racing in Croatia. The main girder construction is a triple joint frame with bending-stiff frame corners. For the entire construction, 330 m³ of glulam timber of wood species spruce and strength class GL24h were used.
Project information | |
---|---|
Customer: | STENAVERT |
Architect or planner: | STUDIO ARS TEMA |
Structural analysis and design: | STUDIO ARS TEMA |
Building owner: | Goran Golubicek |
Year of construction: | 2018 |
Products used: | 330 m³ of glued laminated timber |