The 6-storey Soto Office Building is San Antonio first mass timber project. The building has 5 storeys of timber structure (with more than 11,000 m²) over 1 storey of concrete. DLT (dowel-laminated timber) panels are used for the exposed floor and roof decks and these will be supported by a glulam post and beam frame. This supporting construction was made by of glued laminated timber with complete CNC work, preassembled steel parts and coatings.
Project information | |
---|---|
Location: | San Antonio Texas USA |
Customer: | StructureCraft |
Architect: | Design Architect - Lake Flato; Architect of Record - BOKA Powell |
Structural analysis and design: | StructureCraft |
Builder: | Byrne Construction |
Year of construction: | 2019 |
Products used: | pre fabricated glued laminated timber with complete CNC, pre-assembled steel parts and coating. |